Muddy Road Work and Sticks In the Culvert

Tuesday February 18, 2025 Guerneville CA.

Road work

I needed to put some rock on the old dirt road as there might be some rain coming in and I needed to repair some of the tire ruts.

So, I  headed up through the state park and got my rig going.skiddy1

I repaired this crossing some to get the water to flow better.ditch2

And I hauled some rock to this area, the steepest part of the road, to fix some tire ruts.rocked4

Almost stuck

I almost got stuck in this part on the left. It was wet and soft and Skiddy sunk in it pretty bad so I had to haul quite a bit of rock into it to fix it up to get it in this shape. That also told me to quit while I was ahead as things are still pretty wet and I was making things a bit messy.stuck3

I pretty much got what needed to be done, done.

Park’s kiosk

I headed for home from there down through the state park. Here’s another photo of where the parks kiosk building used to be, before a truck smashed it. The park guys cleaned it up.kiosk5

Back home a nap was in order.

Culvert clean out

Eventually I went over to our property to this creek.creek8

The culvert there needed the sticks cleaned out of it to prevent a plug up.sticks6

I carefully got down there and carefully removed the sticks without getting wet.culvert7

Then it was back home to chair hop around the yard with my chickens.

Nice day.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *