Need to Get the Bulkhead Done Before the Winter Rains

Wednesday November 22, 2023 Guerneville CA.

Bulkhead work

I need to keep working on the bulkhead before the winter rains really start, so I was back at it today.

I’m installing metal frame work in this spot to support  more of the  metal sheets. I first need to dig some holes to put a couple metal posts in the ground to attach to the existing frame to improve it.posts1

 

Posts

I welded the metal pipes for the posts to the old stuff. Things are pretty rusty, so the welds weren’t fancy but should be strong enough to hold this stuff together.pipes2

 

I just finished welding this post after digging the hole deeper.welding3

 

Metal framing

Then I cut some angle iron to length and welded it to the posts to  give the metal sheets some support when I install them.bars4

 

Next spot

I moved to this spot to put a post in, but it was getting dark. I got the post in but had to quit for the day before I got the framing in.spot2

 

It was getting dark fast, so I put the tools away for the night and went up and shut the chickens in for the night.

Guavas

My pineapple guavas are getting ripe and falling on the ground. I saw them when I walked on by and stopped to eat a couple of them.guavas

 

Nice day.

This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Need to Get the Bulkhead Done Before the Winter Rains

  1. Nancy K says:

    Lots of hard work! Interesting those pineapple guava. I’ve never heard of that before.

Comments are closed.