Metal rack work
Slowly but surely I’m getting the metal rack worked on. I needed to weld the posts up so I clamped some braces on it to straighten things up before I welded them up.
I got everything leveled up and then used the level to make sure the posts were straight.
Welding
Then I fired up the welder and started welding the posts on.
Once the posts were all welded up, I took a break and let the whole thing cool off a bit.
Once things were cooled down, I turned the whole thing over and leveled it up again.
Now I need to cut some more parts for the shelves, but not today, I’m trying to give my sore back a break as it’s not liking this welding stuff much, but it is improving.