Friday March 20, 2020 Guerneville CA.
Spring pipes
Today I planned to do some work on our spring pipes up in the hills.
I got the quad runner loaded with my tools and took off to this spot where I was going to do some work.
Bury the pipe
I need to bury the spring water pipe that goes across this road.
I didn’t need to get the pipe in deep, but just get it below the ground surface as there’s not much traffic here.
All buried
And got the pipe buried and now the pipe crossing the road looks like this.
Worked on the pipe trail
After a break I worked on the pipe trail where the pipe goes down the hill to our water tanks. I mostly worked on leveling out the pipe so there were no ups and downs. I wanted a gentle slope down the hill with no ups and downs as the water doesn’t have much pressure, but is mostly gravity fed flowing down the hill.
I walked on down through here where the pipe goes and leveled it out where I could. I have more work to do in this area.
Tired out
That took most of the day and tired me out good.
I went on home from there for something to eat and a nap.
After that I went out and let the chickens out in the yard to graze and chair hopped around supervising them until it was getting dark.
After putting the chickens away I went in the house and that was my day.
Nice day working in the redwood forest. How’s that for isolation? :O)
Sounds pretty isolated to me, Bob! You’ve been busy and I’m assuming your weather is pretty decent for you to be out working.
Stay healthy!