Moving Rock and Notching Pipe For the Bumper Project

Thursday April 18, 2024 Guerneville CA.

Moving rocks

I started the day by going up into the forest and getting some more buckets of rock for under my BBQ stuff. Looks like I need a couple more loads before I’m done.rocks1

Bumper work

Most of the rest of the day I spent working on the bumper for Skiddy. I needed to made two more pipes with notches in them which took quite awhile to make.work2

I kept at it and finally got the two pipes notched.notched3

Welding

Then I welded the two notched pipes to the bumper and then turned the bumper on it’s side to do some more welding on it, but the day was done and I didn’t get all the welding done.bumper

I should be able to finish up the welding on my next work day on the bumper, then it’s sanding and painting.

Nice day.

This entry was posted in Uncategorized. Bookmark the permalink.